Datasheet summary
ACM-10 TDS
PDF datasheet mirror for ACM-10 TDS (Akkim UF Modules). Verify with OEM before design.
Summary
Product identification
- Model: AKUALYS ACM-10
- Revision: 91120000
- Module Diameter: 110 mm
- Body and Cap Material: U-PVC
- Nozzles: NPT ¾ - Victaulic
- Potting Material: Polyurethane
- Membrane Material: Modified PVDF
- Membrane Type: Hollow Fiber UF
- Flow Direction: Outside to inside
- Fiber Outside/Inside Diameter: 1.4 / 0.8 mm
- Active Surface Area: 10 m²
- Nominal MWCO, Dextrane: ≤150,000 Dalton
- Nominal Pore Diameter: 30 nm
Module Specifications
- Model: ACM 10
- Surface Area: 10 m²
- Dimensions (A, B, C, D): 1000±1 mm, 60±1 mm, 65±1 mm, 110±1 mm
- Weight: 6 kg
Feed water
- Temperature: 25 °C (Max 40 °C)
- Particle Dimension: < 300 µ
- Turbidity: 50 NTU (Max 250 NTU)
- Oil and Grease: 0 % (Max 1 %)
- pH: 6-9
- TOC: < 10 mg/l (Max 30 mg/l)
- Total Suspended Solid (TSS): 50 mg/l (Max 80 mg/l)
- Chlorine: 0.4 mg/l (Instant Max. 150 mg/l)
Operating limits
- Operation Modes: Dead End/Crossflow
- Temperature: 1-40 °C
- pH: 2-11
- Filtrate Flux @25°C: 45-180 L/m²h
- Flow Capacity: 0.45-1.80 m³/h
- Feed Water Inlet Pressure @ 25°C: 2-3 bar (Instant Max. 5 bar)
- TMP: 0.4-2 bar
- Backwash Pressure: Max. 2.5 bar
Product water
- Filtrate Water SDI: ≤2.5
- Filtrate Water Turbidity: ≤0.2 NTU
- Produced Water Quality: <0.2 NTU
- Removal Capabilities: Removes viruses, bacteria, and particles including colloids.
Cleaning, Disinfection & Preservative Solution
Cleaning Parameters
- Backwash Pressure: Max. 2.5 bar
- Air Flowrate: 0.5 Nm³/h
- Chemically Enhanced Backwash (CEB) Solutions:
- Sodium Hypochlorite (NaOCl): 1000 mg/l
- Sodium Hydroxide (NaOH): 500 mg/l
- Hydrochloric Acid (HCl): 1000 mg/l
- Citric Acid: 1-2 %
- Clean-in-Place (CIP) Frequency: Current Process TMP(bar) ≥ Initial TMP(bar) + 0.9 bar
- CIP Operation Duration: 2 hours
- CIP Chemical Cleaning Solutions (depend on pollutant):
- 0.1 % NaOH + 0.2 % NaOCl
- 0.2 % HCl, 2 % Citric Acid
Guidelines
- The module must be filled with storage/preservative solution during shut-down.
- At least half capacity must be produced in the first production. If necessary, permeate water and preservative solution must be drained completely.
- Do not operate the module above the pressure limits to avoid membrane deformation.
Cleaning of Preservative Solution
- Preservative Solution Composition: Water/glycerol/sodium metabisulfite.
- Procedure: Drain the module slowly with feed water for a minimum of 4 hours. The used feed water volume must be at least 1.8 m³.
Cleaning-Disinfection
- Procedure:
- Circulate 100 ppm sodium hypochlorite solution for 10 minutes.
- Allow the solution to soak inside the module for 1 hour.
- Drain the module until the filtrate line is free from chlorine.
- Note: A backwash procedure with treated/clean water at start-up is advised.
Process Steps
1. Production
- Forward Flush: The module is rinsed with feed water.
- Filtration: The production is done.
2. Backwash
- Drain: The module is drained.
- Air Scourge: The membranes are scoured by air.
- Backwash-Bottom: The module is rinsed with permeate water (flow direction: top to bottom).
- Backwash-Top: The module is rinsed with permeate water.
3. CEB (Caustic/Chlorine/Acid)
- Drain: The module is drained.
- Air Scourge: The membranes are scoured by air.
- Backwash-Bottom: The module is rinsed with permeate water and chemical (flow direction: top to bottom).
- Backwash-Top: The module is rinsed with permeate water and chemical.
- Soak: All valves are in closed position; membranes are soaked.
- Drain: The module is drained.
- Air Scourge: The membranes are scoured by air.
- Backwash-Bottom: The module is rinsed with permeate water (flow direction: top to bottom).
- Backwash-Top: The module is rinsed with permeate water.
- Forward Flush: The module is rinsed with feed water.