Product identification
- Model: APM
- Body and Cap Material: U-PVC
- Nozzles: DN50 - Victaulic
- Potting Material: Polyurethane
- Membrane Material: Modified PVDF
- Membrane Type: Hollow Fiber UF
- Flow Direction: Outside to inside
- Fiber Outside/Inside Diameter: 1,4 / 0,8 mm
- Active Surface Area: 80 m²
- Nominal MWCO, Dextrane: ≤150.000 Dalton
- Membrane Pore Diameter: 30 nm
Operating limits
- Operation Modes: Dead End/Crossflow
- Temperature: 5-40 °C
- pH: 2-11
- Filtrate Flux @25°C: 45-180 L/m²h
- Flow Capacity: 3,60-14,40 m³/h
- Feed Water Inlet Pressure @ 25°C: 2-3 bar (Instant Max. 5 bar)
- Transmembrane Pressure (TMP): 0,4-2 bar
- Backwash Pressure: Max. 2,5 bar
- Air Flowrate (Backwash): Max. 20 Nm³/h
- Chemically Enhanced Backwash (CEB) Chemicals:
- Sodium Hypochlorite (NaOCl): 1000 mg/l
- Sodium Hydroxide (NaOH): 500 mg/l
- Hydrochloric Acid (HCl): 1000 mg/l
- Citric Acid: 1-2 %
- Clean-in-Place (CIP) Frequency: Current Process TMP(bar) ≥ Initial TMP(bar) + 0,9bar
- CIP Operation Duration: 2 hours
- CIP Chemical Cleaning Solutions (depend on pollutant):
- 0,1 % NaOH + 0,2 % NaOCl
- 0,2 % HCl, 2 % Citric Acid
- Cleaning Flowrate per Module: 1-2 m³/h
Feed water
- Temperature: 25 °C (Max 40 °C)
- Particle Dimension: < 300 µ
- Turbidity: 50 NTU (Max 250 NTU)
- Oil and Grease: 0 % (Max 1 %)
- pH: 6-9
- Total Organic Carbon (TOC): < 10 mg/l (Max 30 mg/l)
- Total Suspended Solid (TSS): 50 mg/l (Max 80 mg/l)
- Chlorine: 0,4 mg/l (Instant Max. 150 mg/l)
Product water
- Quality: < 0,2 NTU
- Filtrate Water SDI: ≤2,5
- Filtrate Water Turbidity: ≤0,2 NTU
Mechanical / hydraulic
- Diameter: 250 mm
- Dimensions (mm):
- A: 1923±1
- B: 2042±1
- C: 314±1
- D: 172±1
- E: 205±1
- Weight: 58 kg
Cleaning, Disinfection & Preservative Solution Guidelines
- Preservative Solution: Composed of water/glycerol/sodium metabisulfite. Cleaning involves draining slowly with feed water for a minimum of 4 hours, using at least 14 m³ of feed water.
- Disinfection: Chemically disinfect against biological contamination using 100 ppm sodium hypochlorite solution, circulated for 10 minutes, then soaked for 1 hour. Module must be drained until filtrate line is free from chlorine.
- Start-up: Backwash procedure with treated/clean water is advised.
Process Steps
The document outlines detailed process steps for Production, Backwash, and Chemically Enhanced Backwash (CEB), including valve positions and sequences for flushing, filtration, draining, air scouring, and rinsing with permeate water and/or chemicals.